U.S. Steel Power House Salvage Segregation
Filing Cabinet
Filing Cabinet > Asset Recovery > U.S. Steel Power House Salvage Segregation
Project Image
Project Image
Project Image
Project Image

U.S. Steel Power House Salvage Segregation

A hydraulic shear was utilized to cut and prepare demolished boiler tubes for shipment.

  • Location:

  • Chicago, IL
  • Scope Of Work:

  • Demolition
    Asbestos abatement
    Utilities
    Special waste removal