Demolition work in active manufacturing facilities demands extensive safety measures, careful scheduling and contract management.

Automotive Paint Oven

Automotive Paint Oven

A paint-drying oven is removed piece by piece.

Concrete Masonry Wall

Concrete Masonry Wall

A skid steer loader was used to remove concrete block walls quickly and safely.

Partial Foundation Removal

Partial Foundation Removal

A hydraulic breaker was used to remove obsolete concrete piers.

Ford Louisville Assembly Plant

Ford Louisville Assembly Plant

Selected structures were removed from an obsolete vehicle assembly line.

Armstrong

Armstrong

Various skills, tools, equipment, and methods were implemented to preserve adjacent structures and utilities during demolition in a congested manufacturing plant.

Electrolux Plant

Electrolux Plant

Production equipment and supporting utility lines were removed in preparation for installation of new equipment.

NASA Altitude Wind Tunnel

NASA Altitude Wind Tunnel

Brandenburg performed the demolition and removal of the Altitude Wind Tunnel, Building 78, and miscellaneous equipment at the NASA facility located in Cleveland, Ohio.

USSGW Number 13 Blast Furnace

USSGW Number 13 Blast Furnace

The Number 13 Blast Furnace, located at United States Steel Gary Works facility, was removed with an aggressive schedule to limit down time and loss of steel production.

BMW Spartanburg Assembly Plant

BMW Spartanburg Assembly Plant

Fast track selective demolition of the assembly line system was necessary to minimize the down time of new vehicle production.