Demolition of stadiums and theaters can present unusual structural issues.
Grand Stand Roof
After careful preparation, two excavators collapsed a portion of the roof in preparation for complete removal of the entire grand stand structure.
Veterans Stadium
Asbestos abatement, demolition, and utility work was performed in preparation for the implosion of 70,000 seat stadium. In addition, 85,000 cubic yards of concrete was processed onsite.