traffic analysis

SubServices Transportation
Services > Structural Demolition > Transportation

Bridge and transportation structure demolition is usually performed under tight schedules to minimize traffic disruption.

Wacker Drive

Wacker Drive

Careful removal of this elevated roadway structure in downtown Chicago was coordinated with new construction work.

Truss Removal

Truss Removal

Detailed planning and close coordination were required to accommodate train schedules throughout the night.

Girder Demolition at CTA Project

Girder Demolition at CTA Project

A shear disconnects a longer girder before cutting it into truck-size pieces.

Shark River Bascule Bridge

Shark River Bascule Bridge

Skilled burners torch cut a section of the heavy bascule bridge end girder. Careful rigging and accurate load calculations were required to lower the girder and attached deck section safely. A flame retardant tarp was attached to the back of the girder to prevent torch sparks and slag from falling onto pleasure boats in the channel below.

x close window
Project Details
Project:
Location:
Facility Type:
Scope Of Work

Project Description