Featured Projects

American National Can

American National Can

Brandenburg was retained by American National Can, Inc. to decontaminate and demolish the 500,000 square foot facility.

3M

3M

Brandenburg was contracted to remove asbestos, solvents, adhesives, buildings, and foundations at 3M's 63-acre tape plant.

Commonwealth Edison

Commonwealth Edison

ComEd and Brandenburg developed a strategic alliance to manage the utility's stranded assets.

AEP Breed Plant

AEP Breed Plant

Brandenburg was contracted by American Electric Power (AEP) to perform total demolition and decommissioning of the former Breed Coal-Fired Generation Plant.

Armstrong

Armstrong

Brandenburg was contracted to perform the environmental remediation and demolition of the Armstrong floor and ceiling tile plant located in Lancaster, PA.

Atlantic Resource Corp. (Superfund)

Atlantic Resource Corp. (Superfund)

Atlantic Resource Corporation was a former precious metal recycling facility listed on the National Priorities List under CERCLA (Sueprfund).

BASF

BASF

Brandenburg was contracted to perform the demolition, remediation, and site preparation of the former BASF plant located in Jamesburg, New Jersey.

Bethlehem Structural Products Corp.

Bethlehem Structural Products Corp.

In 1994, Brandenburg was retained by Bethlehem Steel Corporation (BSC) to dismantle their primary steelmaking facility.

BHP Copper

BHP Copper

BHP Copper, Inc. contracted Brandenburg to raze their 650-acre processing facility located at the 7000-acre mine site in San Manual, Arizona.

BMW

BMW

BMW Spartanburg Plant contracted Brandenburg to perform the fast track selective demolition of the company's only production facility located in the United States.

Camden Prison

Camden Prison

Brandenburg was contracted to perform the environmental remediation, demolition, and site preparation of the Riverfront State Prison in Camden, NJ.

Chicago Housing Authority Implosion

Chicago Housing Authority Implosion

This was the largest implosion ever performed in Chicago. Six buildings, located on the city's southeast side, were imploded in a matter of seconds.

Chicago Skyway

Chicago Skyway

Brandenburg has performed work on the Chicago Skyway as it received many alterations and updates over the past several years.

Chicago Sun-Times Building

Chicago Sun-Times Building

Brandenburg was contracted to demolish the Chicago Sun-Times building to make way for the new 90-story Trump International Hotel & Tower.

Comiskey Park

Comiskey Park

The Illinois Sports Facilities Authority decided to enhance the new Comiskey Park in 2000 to be more fan-friendly, which Brandenburg performed in two phases.

ConEd 59th Street Frequency Changer

ConEd 59th Street Frequency Changer

ConEd elected Brandenburg to remove an obsolete frequency changer and magnesium hydroxide tank from within their Manhattan generation station.

Corning Asahi Video

Corning Asahi Video

Corning Asahi Video manufacturing plant contracted Brandenburg to remediate the entire facility and perform demolition after the plant became obsolete.

Detroit Edison Boiler House

Detroit Edison Boiler House

Brandenburg was retained by Detroit Edison Energy Company to demolish the Fermi 1 Boiler House at the Enrico Fermi Power Station.

East CenterPoint Industrial Center

East CenterPoint Industrial Center

Brandenburg was contracted to perform the demolition, environmental remediation, and site preparation at the former 3 million square foot Reynolds Aluminum Plant.

Emerson Dump

Emerson Dump

Brandenburg was contracted by the City of Philadelphia to excavate the Emerson dump site, extinguish the underground fire, and sort through the material.

Ford Body Shop

Ford Body Shop

Brandenburg used 130 skilled employees around the clock to complete the Ford Taurus assembly line ahead of schedule.

Ford Hazelwood

Ford Hazelwood

Brandenburg was contracted to perform the environmental remediation, asset recovery, and demolition of the entire Ford St. Louis Assembly plant.

Fuels and Chemicals, Inc.

Fuels and Chemicals, Inc.

Brandenburg was retained by the PRP group to provide "fast track" remediation of the Fuels and Chemicals, Inc. former fuels blending facility.

GE Hotpoint

GE Hotpoint

Brandenburg was contracted to perform asbestos abatement, hazardous waste removal, soil remediation, and total demolition of the former 35-acre Hotpoint facility.

Hershey

Hershey

Hershey contracted Brandenburg to remove the old equipment within one of their manufacturing buildings while preserving the historic structure.

JFK Airport Terminal 8

JFK Airport Terminal 8

Brandenburg was contracted to perform the asbestos abatement and demolition of the existing American Airlines Terminal 8.

Lehigh Cement

Lehigh Cement

Brandenburg was contracted to perform the demolition of obsolete equipment and structures within Lehigh's Union Bridge facility.

LWD Incinerator

LWD Incinerator

Brandenburg was hired by the PRP's to decontaminate the buildings and their contents, and then demolish all buildings on LWD's site.

McCormick Place Expansion

McCormick Place Expansion

Brandenburg completed the demolition of the McCormick Place Exposition Center in 75 days, 15 days ahead of schedule.

Michael Reese Hospital

Michael Reese Hospital

Brandenburg completed the environmental remediation and demolition of Michael Reese Hospital, one of the oldest and largest hospitals in Chicago, IL. The company removed 14 structures, totaling over 800,000 square feet.

Miller Park Stadium

Miller Park Stadium

Miller Park Stadium's crane collapse caused considerable damage. Brandenburg was retained to assess the damage because of their expertise.

NASA Altitude Wind Tunnel

NASA Altitude Wind Tunnel

Brandenburg was contracted to perform the demolition and removal of the Altitude Wind Tunnel, Building 78, and miscellaneous equipment at a NASA facility.

Navy Pier Reconstruction

Navy Pier Reconstruction

Brandenburg was contracted by MPEA to perform selective demolition and subsequent construction at Navy Pier in Chicago, Illinois.

Northwestern Memorial Hospital

Northwestern Memorial Hospital

Brandenburg was contracted to perform asbestos abatement and demolition of the Galter Carriage House located on Northwestern Memorial Hospital campus.

Northwestern University Hospital Parking Garage

Northwestern University Hospital Parking Garage

Brandenburg completed the four-story Northwestern University Hospital parking garage project in 30 days to finish ahead of an aggressive schedule.

NYC Department of Sanitation

NYC Department of Sanitation

Brandenburg was contracted to perform the demolition of the Department of Sanitation 73rd Street Incinerator.

OMC

OMC

The EPA controlled the 65-acre OMC property as a Superfund site and hired Brandenburg to demolish the 700,000 square foot facility.

Oscar Mayer

Oscar Mayer

Brandenburg removed the bridge and adjacent structures without any interruptions to the commuter trains at the Oscar Mayer food processing plant.

PECO/Exelon

PECO/Exelon

In 1999, Philadelphia Electric Company (PECO) contracted Brandenburg to perform the asbestos abatement project.

Pennsylvania Power and Light Company

Pennsylvania Power and Light Company

In 1999, Brandenburg was retained by Pennsylvania Power & Light Company (PP&L) to decommission their Holtwood Steam Electric Station.

Premcor Refinery

Premcor Refinery

Brandenburg was hired to decontaminate and dismantle the entire Premcor Refinery facility, located in Blue Island, Illinois.

PSE & G Sewaren Unit #5

PSE & G Sewaren Unit #5

In 2002, Brandenburg was retained by Public Service Enterprise Group (PSE&G) to decontaminate and demolish their Sewaren Unit #5 boiler.

Randhurst Mall

Randhurst Mall

Brandenburg was contracted to perform the selective removal of 50,000 square feet of structure located within Randhurst Mall, including a movie theater. Work was performed without disrupting the ongoing operations surrounding the work area.

Resource Recovery

Resource Recovery

Brandenburg performed analytical analysis on drums of unprocessed liquids and removed aboveground and underground storage tanks at the old Clayton Chemical Plant.

River Terminal

River Terminal

The River Terminal Development Corporation turned to Brandenburg to raze and recycle a 7-story and an 8-story brick and concrete structure.

Ryerson Steel

Ryerson Steel

Brandenburg was contracted to remediate and demolish the former Ryerson Steel manufacturing plant located on the southside of Chicago.

Sears Catalog Warehouse

Sears Catalog Warehouse

Brandenburg performed the demolition of the Sears Catalog Warehouse without compromising a historical clock tower located in the center of the complex.

Shark River Bridge

Shark River Bridge

The historic Route 35 bridge required Brandenburg to perform the total demolition of the bridge including the removal of the piers and pilings.

Soldier Field Stadium

Soldier Field Stadium

Turner Barton-Malow Kenny looked to Brandenburg to perform near-total demolition of the stadium's existing interior.

Soo Terminal

Soo Terminal

Brandenburg performed work of the 900,000 square foot structure at the Soo Terminal without disrupting the adjacent Maxwell Street Market.

Tropicana Parking Garage

Tropicana Parking Garage

Brandenburg was contracted to develop a strategic plan to perform the safe removal of the collapsed portion of Atlantic City's Tropicana Hotel & Casino parking garage.

U.S. Steel Fairfield Works

U.S. Steel Fairfield Works

U.S. Steel retained Brandenburg to provide selective demolition and remediation services at the Fairfield Works coke plant.

U.S. Steel Southworks

U.S. Steel Southworks

Brandenburg provided selective demolition starting in 1980, until the 600-acre plant was completely closed in 1992.

USSSW Blast Furnace

USSSW Blast Furnace

Brandenburg was contracted to perform selective demolition of the Number 13 Blast Furnace located at U.S. Steel Gary Works facility.

Veterans Stadium

Veterans Stadium

Brandenburg erected the largest known mobile crusher in the U.S. to process nearly 85,000 cubic yards of concrete, a result of the Veterans Stadium implosion.

Watts Bar Power Plant

Watts Bar Power Plant

Tennessee Valley Authority (TVA) contracted Brandenburg to perform the total plant decommissioning, including environmental remediation, structural demolition, and site preparation.