3M
Brandenburg was contracted to remove asbestos, solvents, adhesives, buildings, and foundations at 3M's 63-acre tape plant.
|
AEP Breed Plant
Brandenburg was contracted by American Electric Power (AEP) to perform total demolition and decommissioning of the former Breed Coal-Fired Generation Plant.
|
American National Can
Brandenburg was retained by American National Can, Inc. to decontaminate and demolish the 500,000 square foot facility.
|
Armstrong
Brandenburg was contracted to perform the environmental remediation and demolition of the Armstrong floor and ceiling tile plant located in Lancaster, PA.
|
Atlantic Resource Corp. (Superfund)
Atlantic Resource Corporation was a former precious metal recycling facility listed on the National Priorities List under CERCLA (Sueprfund).
|
BASF
Brandenburg was contracted to perform the demolition, remediation, and site preparation of the former BASF plant located in Jamesburg, New Jersey.
|
|
|
BHP Copper
BHP Copper, Inc. contracted Brandenburg to raze their 650-acre processing facility located at the 7000-acre mine site in San Manual, Arizona.
|
BMW
BMW Spartanburg Plant contracted Brandenburg to perform the fast track selective demolition of the company's only production facility located in the United States.
|
Chicago Housing Authority Implosion
This was the largest implosion ever performed in Chicago. Six buildings, located on the city's southeast side, were imploded in a matter of seconds.
|
Chicago Skyway
Brandenburg has performed work on the Chicago Skyway as it received many alterations and updates over the past several years.
|
Chicago Sun-Times Building
Brandenburg was contracted to demolish the Chicago Sun-Times building to make way for the new 90-story Trump International Hotel & Tower.
|
Comiskey Park
The Illinois Sports Facilities Authority decided to enhance the new Comiskey Park in 2000 to be more fan-friendly, which Brandenburg performed in two phases.
|
Commonwealth Edison
ComEd and Brandenburg developed a strategic alliance to manage the utility's stranded assets.
|
ConEd 59th Street Frequency Changer
ConEd elected Brandenburg to remove an obsolete frequency changer and magnesium hydroxide tank from within their Manhattan generation station.
|
Corning Asahi Video
Corning Asahi Video manufacturing plant contracted Brandenburg to remediate the entire facility and perform demolition after the plant became obsolete.
|
Detroit Edison Boiler House
Brandenburg was retained by Detroit Edison Energy Company to demolish the Fermi 1 Boiler House at the Enrico Fermi Power Station.
|
East CenterPoint Industrial Center
Brandenburg was contracted to perform the demolition, environmental remediation, and site preparation at the former 3 million square foot Reynolds Aluminum Plant.
|
Emerson Dump
Brandenburg was contracted by the City of Philadelphia to excavate the Emerson dump site, extinguish the underground fire, and sort through the material.
|
Ford Body Shop
Brandenburg used 130 skilled employees around the clock to complete the Ford Taurus assembly line ahead of schedule.
|
Ford Hazelwood
Brandenburg was contracted to perform the environmental remediation, asset recovery, and demolition of the entire Ford St. Louis Assembly plant.
|
Fuels and Chemicals, Inc.
Brandenburg was retained by the PRP group to provide "fast track" remediation of the Fuels and Chemicals, Inc. former fuels blending facility.
|
GE Hotpoint
Brandenburg was contracted to perform asbestos abatement, hazardous waste removal, soil remediation, and total demolition of the former 35-acre Hotpoint facility.
|
Hershey
Hershey contracted Brandenburg to remove the old equipment within one of their manufacturing buildings while preserving the historic structure.
|
JFK Airport Terminal 8
Brandenburg was contracted to perform the asbestos abatement and demolition of the existing American Airlines Terminal 8.
|
Lehigh Cement
Brandenburg was contracted to perform the demolition of obsolete equipment and structures within Lehigh's Union Bridge facility.
|
LWD Incinerator
Brandenburg was hired by the PRP's to decontaminate the buildings and their contents, and then demolish all buildings on LWD's site.
|
McCormick Place Expansion
Brandenburg completed the demolition of the McCormick Place Exposition Center in 75 days, 15 days ahead of schedule.
|
Miller Park Stadium
Miller Park Stadium's crane collapse caused considerable damage. Brandenburg was retained to assess the damage because of their expertise.
|
NASA Altitude Wind Tunnel
Brandenburg was contracted to perform the demolition and removal of the Altitude Wind Tunnel, Building 78, and miscellaneous equipment at a NASA facility.
|
Navy Pier Reconstruction
Brandenburg was contracted by MPEA to perform selective demolition and subsequent construction at Navy Pier in Chicago, Illinois.
|
Northwestern Memorial Hospital
Brandenburg was contracted to perform asbestos abatement and demolition of the Galter Carriage House located on Northwestern Memorial Hospital campus.
|
|
|
|
|
OMC
The EPA controlled the 65-acre OMC property as a Superfund site and hired Brandenburg to demolish the 700,000 square foot facility.
|
Oscar Mayer
Brandenburg removed the bridge and adjacent structures without any interruptions to the commuter trains at the Oscar Mayer food processing plant.
|
PECO/Exelon
In 1999, Philadelphia Electric Company (PECO) contracted Brandenburg to perform the asbestos abatement project.
|
|
|
Premcor Refinery
Brandenburg was hired to decontaminate and dismantle the entire Premcor Refinery facility, located in Blue Island, Illinois.
|
PSE & G Sewaren Unit #5
In 2002, Brandenburg was retained by Public Service Enterprise Group (PSE&G) to decontaminate and demolish their Sewaren Unit #5 boiler.
|
Resource Recovery
Brandenburg performed analytical analysis on drums of unprocessed liquids and removed aboveground and underground storage tanks at the old Clayton Chemical Plant.
|
River Terminal
The River Terminal Development Corporation turned to Brandenburg to raze and recycle a 7-story and an 8-story brick and concrete structure.
|
Ryerson Steel
Brandenburg was contracted to remediate and demolish the former Ryerson Steel manufacturing plant located on the southside of Chicago.
|
Sears Catalog Warehouse
Brandenburg performed the demolition of the Sears Catalog Warehouse without compromising a historical clock tower located in the center of the complex.
|
Shark River Bridge
The historic Route 35 bridge required Brandenburg to perform the total demolition of the bridge including the removal of the piers and pilings.
|
Soldier Field Stadium
Turner Barton-Malow Kenny looked to Brandenburg to perform near-total demolition of the stadium's existing interior.
|
Soo Terminal
Brandenburg performed work of the 900,000 square foot structure at the Soo Terminal without disrupting the adjacent Maxwell Street Market.
|
Tropicana Parking Garage
Brandenburg was contracted to develop a strategic plan to perform the safe removal of the collapsed portion of Atlantic City's Tropicana Hotel & Casino parking garage.
|
U.S. Steel Fairfield Works
U.S. Steel retained Brandenburg to provide selective demolition and remediation services at the Fairfield Works coke plant.
|
U.S. Steel Southworks
Brandenburg provided selective demolition starting in 1980, until the 600-acre plant was completely closed in 1992.
|
USSSW Blast Furnace
Brandenburg was contracted to perform selective demolition of the Number 13 Blast Furnace located at U.S. Steel Gary Works facility.
|
Veterans Stadium
Brandenburg erected the largest known mobile crusher in the U.S. to process nearly 85,000 cubic yards of concrete, a result of the Veterans Stadium implosion.
|